50POST — Every State. Every Story. My 50POST ↗
LAWS & TAXES / BRIEFING

Agency notice: EPA proposes Guam bulk-fuel discharge permit

Federal · applicability depends on the document

50POST news graphic: Agency notice: EPA proposes Guam bulk-fuel discharge permit
50POST news graphic · story-specific information

EPA Region 9 is proposing to reissue a water-discharge permit for bulk fuel facilities in Guam.

The proposed permit and a corresponding fact sheet are available for public comment.

The EPA is also seeking comment on the frequency, duration and volume of discharges from the facilities for years including 2019 to 2024.

Based on the linked record from Federal Register ↗. Our reporting and verification standards.

A federal document is not a determination of how a law applies to you. A published rule may have a separate effective date. Consult the official record for its terms.
Source, dates and supporting record
Source published
Nov 27, 2026
Last checked
Nov 26, 2026, 9:15 PM EST
Record status
Agency notice
Comment deadline
Dec 28, 2026

Read the original record ↗

Supporting excerpts

The Environmental Protection Agency (EPA), Region 9 is proposing to reissue an NPDES general permit for water discharges from bulk fuel facilities located in Guam (Permit No.
This notice announces the availability of the proposed NPDES general permit and the corresponding fact sheet for public comment, both of which can be found on EPA Region 9's website: https://www.epa.gov/npdes-permits/npdes-permits-epas-pacific-southwest- region-9.
The EPA is also taking comment on the frequency, duration, and volume of water discharges from these bulk fuel facilities for the years including 2019 to 2024.

Original source text

The Environmental Protection Agency (EPA), Region 9 is proposing to reissue an NPDES general permit for water discharges from bulk fuel facilities located in Guam (Permit No. GUG000001). The permit will be reissued upon completion of the notice and comment period and after due consideration has been given to all comments received. Upon issuance, the permit will be valid for five years. Use of an NPDES general permit allows EPA and dischargers to allocate resources in a more efficient manner while ensuring consistent permit conditions for comparable facilities. This notice announces the availability of the proposed NPDES general permit and the corresponding fact sheet for public comment, both of which can be found on EPA Region 9's website: https://www.epa.gov/npdes-permits/npdes-permits-epas-pacific-southwest- region-9. The EPA is also taking comment on the frequency, duration, and volume of water discharges from these bulk fuel facilities for the years including 2019 to 2024. A prior version of this permit was published for public review in the Federal Register on April 17, 2025. The current version available for public review incorporates changes based on additional discharge data submitted by permittees and revised habitat monitoring as an outcome of Endangered Species Act and Essential Fish Habitat consultations with the National Marine Fisheries Service.

Source wording and its time zone may differ. Date-only dates are preserved. Timestamps here use Eastern Time. Evidence version: f3f15eaac674d3d2208072bb293ad0c8db529bb81375ed7b06aa17f3b32d2e87

Source guidance

Consult the linked document and official PDF. Publication does not by itself establish that a rule is currently in force.

Original guidance from the issuing source. For current warnings and instructions, consult that source directly. This site is not an emergency notification service.

Something doesn’t look right?

Tell the editor what needs checking. Please avoid personal or sensitive details.

Sign in if needed to submit a report